当前位置:经典范文谷>自我鉴定>自我评价>

电气自动化英文自我评价

自我评价 阅读(6.79K)

仅仅由别人的评价来判定自己是不全面的,当自己也沉淀下来,窥探自己的内心,写下自己的自我评价,这样才可以不断进步。但是自我评价要怎么写呢?下面是本站小编为大家带来电气自动化英文自我评价,相信对你会有帮助的。

电气自动化英文自我评价
电气自动化英文自我评价篇一

An excellent electrical engineer with 15 years of electrical work seek the position of electrical engineer, in order to give full play to 10 years of state-owned enterprises and five years of foreign engineers work accumulated by the rich professional knowledge and skills, including the design and review of electrical drawings, various industrial field automation control system installation and commissioning, Of the commercial negotiations and on-site installation commissioning and guidance, all kinds of imported equipment maintenance and maintenance.

I hope to be able to use my knowledge and accumulated work experience to better serve your company while maximizing the interests of the enterprise. During the project construction period or after the factory is put into operation, I hope to be an electrical engineer.

电气自动化英文自我评价篇二

In short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.

In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.

Summed up the work of the past year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well.

电气自动化英文自我评价篇三

At present, he works in the domestic and international famous steel enterprise engineering technology limited company (metallurgy grade A, civilian grade A), mainly engaged in the industry and the people electrical engineering project design work and the project manager work.

Mainly for the iron and steel metallurgy, such as rolling, steel, sintering, ironmaking, chemical and civil construction projects such as electrical design work, mainly involved in the design project are:

Large-scale sintering desulfurization project, domestic sewage treatment, waste acid treatment, chemical companies for power distribution system transformation, lime cellar frequency and control system transformation, a district police station and other industrial and civil project design icipate in the project both industrial electrical automatic control system design, and high and low voltage power supply and distribution systems, substations, transmission systems, residential, office buildings and other public construction projects electrical design.

Up to now, the company has completed more than 100 projects of large and small projects with more than 10 million yuan of investment, mainly in charge of department of electrical professional, chief engineer, registered electrical engineer and project manager.

电气自动化英文自我评价篇四

Graduated from *** Technical University of Electrical Engineering and Automation, outstanding academic performance during the school, has entered the tutor electrical automation laboratory for electrical component selection and functional testing, controller design and functional debugging, programming control and electrical systems Of intelligent control;

After graduation, the company entered the State Power Automation Co., Ltd., is responsible for product design and debugging, field equipment installation, commissioning and acceptance work for the hydropower station and power plants to provide monitoring equipment, proficient in the host computer and Under the machine system, various types of PLC and touch screen programming control; in the field during the service has repeatedly praised by customers, to work seriously responsible, good communication, coordination has a strong organizational skills and team spirit, lively and cheerful, optimistic progress; Motivated, diligent in learning can continue to improve their own ability and overall quality. In the future work, I will be full of energy, assiduously study the spirit to work hard and steadily improve their ability to work with the simultaneous development of enterprises.